Virginia Theological Seminary Addison Academic Center Renovation

Alexandria, VA

Owner

Virginia Theological Seminary (VTS)

Timeframe

2018 – 2020

Size

37,250 SF

Cost

Confidential

The scope of work will be to provide design services for renovations and HVAC modernization at the Addison Academic Center for the Virginia Theological Seminary (VTS).  The project scope of work is outlined in the Addison Academic Center Planning Concept Study from April 30th, 2018.  The target construction cost is approximately $6.4 million for the layout renovations and HVAC modernization to the existing building.  The project aimed to adhere to sustainable design practices and principles, but it is not the project’s intent to pursue certification with USGBC or an equivalent rating system.

Project Goals

The Addison Academic Center was in need of a major renovation to update aging systems and modernize the building to meet 21st-century student learning styles to support both on-campus and digital learning.

Services

Originally an HVAC modernization, this project required disruption to areas throughout the building interior to access existing systems. 2RW and the design team used this opportunity to modernize the interior to better support VTS, introducing multi-purpose meeting and event spaces, offices, flexible classrooms, a nursery, and a café for the campus and community.

2RW conducted a comprehensive systems assessment to evaluate the impact of the renovation on existing MEP/FP systems and developed recommendations to guide the design. The subsequent MEP/FP design includes an energy-efficient hydronic HVAC system connected to campus utilities, Variable Air Volume (VAV) controls with Demand Control Ventilation (DCV), LED lighting with digital controls and preset scene programming, and integration of an updated Building Automation System (BAS) with the central campus BAS for monitoring and automated alerts.

Results

The new HVAC system, connected to the central campus utilities, improves the building’s efficiency, thermal comfort, and reliability while simplifying maintenance.

Partners

Bowie Gridley Architects

Bennett & Pless

Whiting-Turner

Phase Shift Consulting

Awards

2RW Logo
Team
2RW_Jagadeesh_WWW_RGB | | 2RW

Jyn Jagadeesh, PE, LEED AP BD+C

Project Engineer, Mechanical
2RW_Wilson_RGB_Web | | 2RW

Brandon Wilson, PE

Principal
2RW_Hoffmann_WWW_RGB | | 2RW

Lucas Hoffmann, PE, LEED AP BD+C

Principal
2RW_Phan_WWW_RGB | 2RW

Julie Phan

Electrical Engineer
2RW_Evelyn_WWW_RGB | 2RW

Mikal Evelyn

BIM/CADD Coordinator
2RW_Willaims_WWW_RGB | 2RW

Stephen Williams

BIM/REVIT Manager
2RW_Gidey_WWW-RGB | | 2RW

Ted Gidey, CPD, GPD

Senior Plumbing Engineer
Adrienne Hendrickson, PE, LEED AP BD+C | | 2RW

Adrienne Hendrickson, PE

Senior Electrical Engineer

Project Gallery

Image credit

2RW Consultants

SIMILAR PROJECTS