Photo Credit: 2RW Consultants

German International School Health Clinic Fitout and KiGa Renovation

Potomac, MD

Owner

German International School

Timeframe

2023 – 2024

Size

1,000 SF Fitout / 2,000 SF Renos

The German International School of Washington renovated existing campus space to create a new on-site health clinic and expand its early childhood education program with additional KiGa classrooms and support spaces. 2RW provided MEP/FP engineering for the phased renovation, adapting existing building systems to support the new uses while maintaining school operations. The design maximized usable program space and supported compliance with Montgomery County Green Building requirements.

Project Goals

The German International School of Washington sought to enhance student support services and expand early childhood education space within its existing campus. The project included the creation of a new on-site health clinic and the renovation of an existing area to accommodate additional kindergarten (KiGa) classrooms and support spaces. A key goal was to integrate these improvements within the existing building while maximizing usable program space, maintaining alignment with sustainable design practices and meeting Montgomery County Green Building requirements.

Services

2RW provided MEP/FP engineering services for the phased renovation of two distinct but related program areas within the existing school. The project was executed as a phased renovation within an occupied facility. MEP systems were designed to integrate with existing building infrastructure and sequenced to allow construction to occur in defined areas while maintaining operations in adjacent spaces.

The health clinic fit-out introduced dedicated medical support spaces, including exam and recovery rooms, an entry and waiting area, staff work areas, and an ADA-compliant toilet room. MEP systems were modified to support clinical functions, including ventilation and exhaust for exam spaces, plumbing systems for fixtures and handwashing, and electrical infrastructure to support medical equipment, lighting, and life safety systems.

The KiGa renovation converted an existing apartment area into new classrooms, offices, restrooms, and support spaces, including laundry and bathroom facilities. Mechanical systems were adapted from existing infrastructure, including modifications to ductwork, outside air connections, and exhaust systems to serve classrooms and support spaces. Plumbing systems were extended to serve new toilet rooms, sinks, and support areas, while electrical work included updates to lighting, power distribution, and fire alarm systems throughout the renovated spaces.

Results

The project provides the school with expanded early childhood learning environments and a dedicated on-site health clinic, improving both daily operations and student support services. The design maximized the use of existing space, with careful planning of HVAC systems and equipment to minimize footprint and allow program areas to function efficiently within the existing building constraints, resulting in flexible, functional spaces that fully support the school’s needs.

Partners

Sanchez Palmer Architects

Awards

2RW Logo
Team
2RW_Hoffmann_WWW_RGB | | 2RW

Lucas Hoffmann, PE, LEED AP BD+C

Principal
2RW_Evelyn_WWW_RGB | 2RW

Mikal Evelyn

BIM/CADD Coordinator
2RW_Tangaran_WWW_RGB | 2RW

John Rey Tangaran

Mechanical Engineer
2RW_Wilson_RGB_Web | | 2RW

Brandon Wilson, PE

Principal
2RW_Gidey_WWW-RGB | | 2RW

Ted Gidey, CPD, GPD

Senior Plumbing Engineer

Project Gallery

Image credit

2RW Consultants

SIMILAR PROJECTS