MEP/FP engineering for this phased renovation of shell space supports offices, warehouse, and high-occupancy training areas while bringing the building up to code and meeting ADA requirements. The design includes upgraded rooftop HVAC systems, a new electrical distribution system, a machine-room-less hydraulic elevator, updated restrooms, and a new fire alarm system, with construction completed in three phases.
2RW conducted a field survey to determine the building use and evaluate the existing rooftop units to determine the feasibility/applicability of re-use. Based on the high occupancy nature of the training room areas, 2RW determined the need for additional-capacity rooftop units and a system upgrade.
2RW provided MEP/FP engineering including:
Karl Riedel Architecture
Bennett & Pless