MEP engineering services for this term contract project included a field survey and feasibility study, followed by design and construction administration for system upgrades. The design incorporates a dedicated outside air system with new package terminal heat pumps and a direct digital control building automation system integrated with the campus network for monitoring and alerts.
As prime consultant on this term contract project, 2RW’s services include:
Hobbs & Associates
Springpoint Structural
Downey & Scott, LLC