Project Goals
The renovation of Pinn Hall’s (formally Jordan Hall) seventh floor lab included a complete renovation of the existing laboratory into a combination of open lab, office, laboratory support, and equipment spaces.
Services
2RW contributed to a pre-planning study and subsequently provided MEP/FP engineering services for the renovation of this space. Components of this project included:
- Modification of existing sprinkler system to accommodate new floor plan.
- New plumbing and laboratory gas (natural gas, vacuum, compressed air) from existing utility chase.
- Replaced existing constant-volume HVAC system with variable-volume boxes with reheat and pressure independent variable-volume valves for laboratory spaces.
- Pressure-independent variable volume valves on exhaust hoods and general exhaust systems.
- All-new fluorescent and LED lighting.
- New power, emergency power, data, and fire alarm systems.