2RW provided MEP/FP engineering for this new high school, which opened fall 2019. Services included the design of low-voltage and audio visual/information technology systems. The MEP/FP design incorporates environmentally sustainable best practices while meeting the requirements of educational facility guidelines and standards.
The sustainable systems include high-efficiency condensing water heaters, low-flow fixtures, and natural and LED lighting with daylight sensors. The facility is comprised of classrooms, a media center, cafeteria, auditorium, gymnasiums, and outdoor artificial turf fields.