MEP/FP engineering for the fitout of floors 1 & 2 in the new Lacy Hall building. Includes a large, mostly open cabinet shop space onthe 1st floor and houses vaiours floor mounted woodworking tools, a self-contained paint spray booht and dust collecgtion sustem with outdoor cyclone separator.
2RW provided a variety of services for this project which included:
2RW worked closely with University faculty and staff as they identified the facility’s overlapping uses and consolidated them into a cost-effective design that met their unique needs. Close collaboration of the users and design/construction teams ensured that task-specific design requirements such as lighting levels, equipment power requirements, exhaust, thermal comfort conditions, and environmental controls were satisfied while staying within the project’s budget.