Photo Credit: 2RW Consultants

Stafford County Public Schools Ferry Farm Elementary School Renovation and Addition

Fredericksburg, VA

Owner

Stafford County Public School

Timeframe

2019 – 2021 (est.)

Size

Renovation: 42,000 SF; Addition: 6,500 SF

Cost

$9.7 million (est.)

MEP engineering for the phased renovation and expansion supports increased school capacity, modernization of the building, and incorporation of high-efficiency systems across K–3 learning areas, classrooms, a library, administrative and clinic spaces, and outdoor learning environments. The project includes two additions with new learning spaces, a secure entry vestibule, and relocated administrative and clinic areas, along with upgrades to existing spaces and a central courtyard. The design incorporates a VRF hybrid HVAC system with DOAS and energy recovery, high-efficiency boilers, individual space controls, low-flow plumbing fixtures, LED lighting, and updated voice and data systems.

Project Goals

Ferry Farm Elementary School was expanded three times after it was built in 1957, which created a fragmented configuration with disjointed systems. A series of major renovations and additions were begun in 2019 to increase the school’s capacity, create cohesion, modernize the facilities, and incorporate high-efficiency building systems.

Services

This project began with a renovation of the K-3 learning area. Updates include two additions which will provide additional learning spaces, a secure and accessible entry vestibule, and a new location for the administrative and clinic spaces. It also entails upgrades to classrooms, a library, and a central courtyard which features outdoor learning areas and accessible entrances.

2RW’s services include:

  • A site investigation during the scope planning process to compare the costs and benefits of building a new school versus renovating the existing facility
  • MEP/FP design for new systems and controls that will reduce energy and water use, improve ventilation, and make the school more comfortable. They include:
    • A new variable refrigeration flow (VRF) hybrid HVAC system supported by a dedicated outdoor air system (DOAS) with energy recovery
    • New high-efficiency condensing boilers
    • Individual temperature controls for learning spaces, offices, and conference rooms
    • Low-flow plumbing fixtures
    • LED lighting
    • New voice/data systems

Results

The renovated school is more energy-efficient and comfortable for students, teachers, staff, and community members due to:

  • Individual space controls which maintain temperature and humidity conditions in all seasons
  • New air handling equipment which provides better ventilation and energy recovery

Partners

VMDO Architects

Timmons Group

Springpoint Structural LLC

Downey & Scott, LLC

Awards

2RW Logo
Team
Man smiling wearing white collared shirt and blue suit jacket standing outside

Matthew Lewis, PE

Principal
Smiling man with facial hair wearing collared shirt and jacket standing outside

Neal Cramer, PE

Principal
2RW_Woolford_WWW_RGB-1 | 2RW

Dan Woolford, PE, CEM, BEP

Senior Mechanical Engineer
2RW_Prevatt_WWW_RGB | | 2RW

Bethany Prevatt

BIM/CAD Operator
2RW_Scerbo_Resume_WWW_RGB | | 2RW

Joe Scerbo, CPD, GPD

Senior Plumbing Engineer
2RW_Willaims_WWW_RGB | 2RW

Stephen Williams

BIM/REVIT Manager