Edmund Burke School Campus Master Plan and Renovation

Washington, DC

Owner

Edmund Burke School

Timeframe

2019 – 2022

Size

35,678 SF

Cost

$2.5 million

Edmund Burke School undertook a campus master planning and renovation effort to modernize facilities and expand academic, athletic, and student-support programs within its existing footprint. 2RW provided MEP/FP systems assessment and design for phased upgrades to spaces including the gymnasium, fitness and locker rooms, classrooms, art studios, multipurpose areas, and health suite, carefully adapting existing systems to maximize usable space while maintaining school operations.

Project Goals

Edmund Burke School sought to evaluate and modernize its campus facilities to better support evolving program needs. Through a campus master planning effort, the goal was to identify strategic renovations to enhance academic, athletic, and student-support spaces while making efficient use of the existing building. A key priority was expanding program capacity within the current footprint, minimizing disruption to ongoing school operations.

Services

2RW conducted an MEP/FP systems assessment and collaborated on the campus master plan to identify renovation strategies aligned with the school’s program and facility goals. Following the planning effort, 2RW provided MEP/FP engineering design for HVAC modifications to support renovation areas across the campus.

The project included system upgrades for a range of program spaces, including the gymnasium, fitness and weight rooms, locker rooms, multipurpose areas, art studios, classrooms, and the health suite. HVAC systems and zoning were reconfigured through modifications to existing air distribution, and exhaust systems to accommodate the varying needs of these spaces. To support the additional program space created within the existing footprint, new MEP systems were thoughtfully adapted and coordinated to fit within existing building constraints, allowing architectural layouts to maximize usable area.

Design and construction were carefully phased to maintain school operations throughout the project. MEP systems were sequenced to support work in occupied areas, requiring coordination with existing infrastructure and planning to maintain continuity of service during renovations.

Results

The project provides targeted system upgrades that support a diverse range of academic and athletic programs while improving overall building performance. By prioritizing efficient system design and thoughtful integration within existing conditions, the renovations maximize usable space and provide a flexible, functional environment that supports the school’s ongoing needs.

Partners

Bowie Gridley Architects

Awards

2RW Logo
Team
2RW_Hoffmann_WWW_RGB | | 2RW

Lucas Hoffmann, PE, LEED AP BD+C

Principal
2RW_Evelyn_WWW_RGB | 2RW

Mikal Evelyn

BIM/CADD Coordinator
2RW_Daughtry_WWW_RGB | 2RW

Zach Daughtry, PE

Mechanical Engineer
2RW_Jagadeesh_WWW_RGB | | 2RW

Jyn Jagadeesh, PE, LEED AP BD+C

Project Engineer, Mechanical
2RW_Gidey_WWW-RGB | | 2RW

Ted Gidey, CPD, GPD

Senior Plumbing Engineer
2RW_Wilson_RGB_Web | | 2RW

Brandon Wilson, PE

Principal
2RW_Green_WWW_RGB | | 2RW

Griffin Green, PE, LEED AP BD+C

Senior Mechanical Engineer

Project Gallery

Image credit

2RW Consultants

SIMILAR PROJECTS