An engineering report by the county highlighted the need to replace Lovettsville Fire and Rescue Station 12, originally built in 1974 with two subsequent additions. The replacement is essential to address programmatic deficiencies and enhance the operational effectiveness of the Fire and Rescue System.
2RW provided MEP/FP engineering for the new station with a mezzanine, which includes four high-volume apparatus bays, living quarters, kitchen, dining and dayroom facilities, exercise rooms, administrative spaces, and equipment maintenance/storage areas. The design for the 24/7 facility includes zoned HVAC systems to condition unused spaces on an as-needed basis, improving energy efficiency and resource management. The design also supports hot zone strategies by strategically placing gathering and administrative spaces together, effectively preventing contaminants from entering the living quarters. This thoughtful approach ensures both operational efficiency and enhanced safety for occupants, meeting the unique demands of around-the-clock operations.
The design supported the Owner’s sustainability goals by targeting LEED v4 Silver certification and incorporating WELL Building strategies. Key MEP features high-efficiency HVAC, radiant heat, lighting systems, and a photovoltaic (PV) array.
Energy modeling at the design phase indicated an energy use intensity (EUI) of 65.6 kBtu/ft², a 25% reduction in energy use and cost compared to baseline systems. Notable savings, particularly in space heating (~$5,400 annually), were realized through ventilation heat recovery, an improved building envelope, and high-performance building systems. These measures ensured the facility met stringent energy and operational standards while prioritizing the health and safety of first responders.
OWNER: Loudoun County
TIMEFRAME: 2020 – 2025
SIZE: ~19,000 SF
COST: $13.3 million
ESTIMATED ENERGY SAVINGS: $6,600