The Public Safety Center (PSC) encompasses two buildings, the eight-story William G Truesdale Detention Center and the three-story Administrative Offices Building. A feasibility study was needed to develop a renovation plan. This plan will inform a 10-year master plan which will consider solutions to infrastructure, building reconfiguration options, energy conservation, wellness, ADA, and MEP concerns.
2RW conducted the MEP engineering component of the feasibility study to identify existing systems in need of modernization, the future programmatic and space requirements, and help develop renovation cost estimates. 2RW’s scope of work included:
The MEP/FP feasibility study will be incorporated into a summary report and subsequent master plan.
OWNER: City of Alexandria
TIMEFRAME: 2020 – Ongoing
SIZE: 200,000 SF