The Edmund Burke School: Engineering for College-Ready Learning

19130_Edmund Burke Sch Campus MP and Reno-3 | | 2RW

With visions for a functional environment where students are set up for success, 2RW provided mechanical, electrical, plumbing, and fire protection (MEP/FP) engineering as part of the Edmund Burke School’s renovations. Using the existing master plan and structures, MEP and FP systems were adapted to ensure temperature-sensitive airflow, up-to-date fire systems, and exhaust systems while leaving plenty of usable space for student activities. System upgrades were made to gymnasiums, multi-purpose spaces, art studios, classrooms, and the health suite. Modifying and updating the spaces students know and love, 2RW’s invisible support helped support the variety of activities that make up a college-preparatory education. 

Read more about the team and project that took existing footprints into modern systems here!