Pensacola, FL

Marine Corps Recruit Depot Parris Island

Scope of Services
Energy and Water Audits
 

2RW performed detailed Energy Independence and Security Act (EISA)-compliant energy and water audits of 25 buildings at the Marine Corps Recruit Depot (MCRD) in Parris Island, South Carolina.

2RW Project Case Study Main Image
Services

2RW provided energy and water audit services, including:

  • Field investigation and documentation of existing conditions
  • Analysis of energy conservation measures (ECMs) using Trane TRACE™ energy simulation models
  • Scope of work, cost estimate, simple payback calculations, and life cycle cost analysis (LCCA) for each measure
  • ECM implementation cost estimates

Areas Assessed:

  • Chiller plant improvements
  • Building automation systems (BAS)
  • Heating, ventilating, and air conditioning (HVAC)
  • Lighting
  • Building envelope
  • Chilled and hot water systems
  • Electric motors and drives
  • Energy/utility distribution systems
  • Water and sewer systems

Electrical peak shaving/load shifting

Advanced metering

Appliance/plug-load reductions

Results

The following ECMs where identified:

  • Retro-commissioning
  • Controls upgrade
  • Lighting fixtures and lighting controls upgrades
  • Domestic hot water (DHW) system efficiency improvements including solar thermal DHW and heat pump water heaters
  • HVAC system replacements and retrofits including geothermal heat pumps and higher efficiency chillers
  • Miscellaneous items including a pool cover, VAV range hoods, vestibules, attic fans, and exhaust air energy recovery
Scope of Services
Energy and Water Audits
 

OWNER: United States Marine Corps

TIMEFRAME: 2010 – 2011

SIZE: 704,808 SF

COST: $214,280